RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1708018990 - Archived data from Tue, 11. August 2020 17:50:52 CEST


This is all the information about APD 1708018990. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1708018990
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 393.8 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 264
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.7044536 V     T = -25 °C: 357.0825067 V
Voltage for Gain 150: T = +20 °C: 401.6333633 V     T = -25 °C: 364.7803384 V
Voltage for Gain 200: T = +20 °C: 406.0164722 V     T = -25 °C: 369.0891246 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.346799355 V-1     T = -25 °C: 4.694234921 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.271709752 V-1     T = -25 °C: 9.309404103 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49495866 V-1     T = -25 °C: 14.55631267 V-1
Break-through voltage: T = +20 °C: 420.000562 V     T = -25 °C: 383.6889768 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:45 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:22:22 CET jreher Updated box and position via API.
11. Aug 2020 17:50:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:05 CEST jreher Updated box and position via API.
03. Dec 2019 14:46:02 CET jreher Updated APD location via API.
02. Dec 2019 19:19:36 CET spankonin Updated box and position via API.
02. Dec 2019 19:10:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:24 CEST Tobias Imported from Hamamatsu datasheet.