RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1708018987 - Archived data from Tue, 11. August 2020 17:50:51 CEST


This is all the information about APD 1708018987. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1708018987
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1708018987/2705030330
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.4 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 264
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.8107864 V     T = -25 °C: 356.4443852 V
Voltage for Gain 150: T = +20 °C: 400.7450643 V     T = -25 °C: 364.1072525 V
Voltage for Gain 200: T = +20 °C: 405.1350066 V     T = -25 °C: 368.4124325 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.65897946 V-1     T = -25 °C: 4.636185004 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.258974426 V-1     T = -25 °C: 9.141187818 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.46034632 V-1     T = -25 °C: 14.25342003 V-1
Break-through voltage: T = +20 °C: 421.1287412 V     T = -25 °C: 384.4876852 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:22 CET jreher Updated box and position via API.
11. Aug 2020 17:50:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:05 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:35 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:12 CET jreher Updated box and position via API.
03. Dec 2019 14:46:01 CET jreher Updated APD location via API.
02. Dec 2019 19:19:35 CET spankonin Updated box and position via API.
02. Dec 2019 19:10:36 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:24 CEST Tobias Imported from Hamamatsu datasheet.