RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1708018985 - Archived data from Tue, 11. August 2020 17:50:50 CEST


This is all the information about APD 1708018985. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1708018985
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.3 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 264
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.1505095 V     T = -25 °C: 353.9056187 V
Voltage for Gain 150: T = +20 °C: 398.1110537 V     T = -25 °C: 361.4641376 V
Voltage for Gain 200: T = +20 °C: 402.5352698 V     T = -25 °C: 365.7014655 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.481623562 V-1     T = -25 °C: 4.876137748 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.765979807 V-1     T = -25 °C: 8.871387405 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29444515 V-1     T = -25 °C: 15.50749865 V-1
Break-through voltage: T = +20 °C: 417.1945958 V     T = -25 °C: 380.6737882 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:21 CET jreher Updated box and position via API.
11. Aug 2020 17:50:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:05 CEST jreher Updated box and position via API.
03. Dec 2019 14:46:01 CET jreher Updated APD location via API.
02. Dec 2019 19:19:35 CET spankonin Updated box and position via API.
02. Dec 2019 19:10:36 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:24 CEST Tobias Imported from Hamamatsu datasheet.