RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1706018871 - Archived data from Tue, 11. August 2020 17:50:27 CEST


This is all the information about APD 1706018871. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1706018871
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.8 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 258
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.5423103 V     T = -25 °C: 357.4535947 V
Voltage for Gain 150: T = +20 °C: 401.3647716 V     T = -25 °C: 365.1175293 V
Voltage for Gain 200: T = +20 °C: 405.699727 V     T = -25 °C: 369.4135914 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429898291 V-1     T = -25 °C: 4.585796376 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.649149926 V-1     T = -25 °C: 9.001919549 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03963371 V-1     T = -25 °C: 15.81551929 V-1
Break-through voltage: T = +20 °C: 415.531163 V     T = -25 °C: 384.8630047 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:32 CET jreher Updated box and position via API.
11. Aug 2020 17:50:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:58 CEST jreher Updated box and position via API.
05. Dec 2019 13:58:47 CET jreher Updated box and position via API.
03. Dec 2019 14:46:41 CET jreher Updated APD location via API.
02. Dec 2019 19:19:00 CET spankonin Updated box and position via API.
02. Dec 2019 19:14:22 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:42:22 CEST Tobias Imported from Hamamatsu datasheet.