RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1704018675 - Archived data from Thu, 19. December 2019 15:18:31 CET


This is all the information about APD 1704018675. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1704018675
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.4 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 499
Position in grid: 14
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 393.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:42 CET jreher Updated box and position via API.
11. Aug 2020 17:58:06 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:12 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:03 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:47 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:31 CET jreher Updated box and position via API.
17. Nov 2017 09:40:11 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:00 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:10:57 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:53 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:42:17 CEST Tobias Imported from Hamamatsu datasheet.