RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1704018667 - Archived data from Thu, 16. December 2021 13:40:39 CET


This is all the information about APD 1704018667. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1704018667
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 392.6 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 305
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 499
Position in grid: 6
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 392.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.6451678 V     T = -25 °C: 356.5746571 V
Voltage for Gain 150: T = +20 °C: 400.5760781 V     T = -25 °C: 364.221905 V
Voltage for Gain 200: T = +20 °C: 404.9492114 V     T = -25 °C: 368.4975658 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.333948776 V-1     T = -25 °C: 4.530630267 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.290704022 V-1     T = -25 °C: 8.959302454 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58979103 V-1     T = -25 °C: 15.79060953 V-1
Break-through voltage: T = +20 °C: 414.5222183 V     T = -25 °C: 383.5132661 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:56:21 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:40:39 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:27:41 CET jreher Updated box and position via API.
11. Aug 2020 17:58:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:12 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:02 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:22 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:30 CET jreher Updated box and position via API.
17. Nov 2017 09:40:11 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:00 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:10:57 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:53 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:42:17 CEST Tobias Imported from Hamamatsu datasheet.