RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Grid Overview

Grid specification:  
Grid number: 378
Number of APDs: 18
   
Grid information:  
Arrival for irradiation: 29. Sep 2017
Date of irradiation: 25. Oct 2017
Irradiation temperature: 20 °C
Irradiation voltage: individual voltage
Irradiation dose: 45 Gy
Irradiation position: 3
Shipped for annealing/analysis: 27. Oct 2017
Annealing date: none
Annealing temperature: none
Annealing duration: none
Return for assembly: none
Operations: Enter irradiation dataEnter annealing dataEnter shipment data
   
Grid overview:  
Slot 0: 1407015556 (HV connected)
Slot 1: empty
Slot 2: 1407015559 (HV not connected)
Slot 3: 1407015560 (HV connected)
Slot 4: 1407015561 (HV connected)
Slot 5: 1407015562 (HV connected)
Slot 6: 1407015563 (HV connected)
Slot 7: 1407015564 (HV connected)
Slot 8: 1407015565 (HV connected)
Slot 9: 1407015566 (HV not connected)
Slot 10: 1407015567 (HV connected)
Slot 11: 1407015568 (HV connected)
Slot 12: 1407015569 (HV connected)
Slot 13: 1407015570 (HV connected)
Slot 14: 1407015571 (HV connected)
Slot 15: 1407015572 (HV connected)
Slot 16: 1407015573 (HV connected)
Slot 17: 1407015574 (HV connected)
Slot 18: empty
Slot 19: 1407015576 (HV connected)