RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Grid Overview

Grid specification:  
Grid number: 350
Number of APDs: 18
   
Grid information:  
Arrival for irradiation: 02. Nov 2017
Date of irradiation: 29. Nov 2017
Irradiation temperature: 20 °C
Irradiation voltage: individual voltage
Irradiation dose: 45 Gy
Irradiation position: 4
Shipped for annealing/analysis: none
Annealing date: none
Annealing temperature: none
Annealing duration: none
Return for assembly: none
Operations: Enter irradiation dataEnter annealing dataEnter shipment data
   
Grid overview:  
Slot 0: 1319014941 (HV not connected)
Slot 1: 1319014942 (HV connected)
Slot 2: 1319014943 (HV connected)
Slot 3: 1319014944 (HV connected)
Slot 4: 1319014945 (HV connected)
Slot 5: 1319014946 (HV connected)
Slot 6: 1319014947 (HV connected)
Slot 7: 1319014948 (HV connected)
Slot 8: 1319014949 (HV connected)
Slot 9: 1319014950 (HV connected)
Slot 10: 1319014951 (HV not connected)
Slot 11: empty
Slot 12: 1319014953 (HV connected)
Slot 13: 1319014954 (HV connected)
Slot 14: 1319014955 (HV connected)
Slot 15: 1319014956 (HV connected)
Slot 16: 1319014957 (HV not connected)
Slot 17: 1319014959 (HV connected)
Slot 18: 1319014961 (HV connected)
Slot 19: empty