RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Grid Overview

Grid specification:  
Grid number: 298
Number of APDs: 20
   
Grid information:  
Arrival for irradiation: 11. Aug 2016
Date of irradiation: 23. Aug 2016
Irradiation temperature: 25 °C
Irradiation voltage: 350 V
Irradiation dose: 30 Gy
Irradiation position: 1
Shipped for annealing/analysis: 02. Sep 2016
Annealing date: 24. Aug 2016
Annealing temperature: 80 °C
Annealing duration: 10 h
Return for assembly: 06. Oct 2016
Operations: Enter irradiation dataEnter annealing dataEnter shipment data
   
Grid overview:  
Slot 0: 1304013760 (HV not connected)
Slot 1: 1304013763 (HV connected)
Slot 2: 1304013762 (HV connected)
Slot 3: 1304013765 (HV connected)
Slot 4: 1304013764 (HV connected)
Slot 5: 1304013767 (HV connected)
Slot 6: 1304013766 (HV connected)
Slot 7: 1304013771 (HV connected)
Slot 8: 1304013772 (HV connected)
Slot 9: 1304013773 (HV connected)
Slot 10: 1304013774 (HV connected)
Slot 11: 1304013775 (HV connected)
Slot 12: 1304013776 (HV connected)
Slot 13: 1304013777 (HV connected)
Slot 14: 1304013778 (HV connected)
Slot 15: 1304013779 (HV connected)
Slot 16: 1304013780 (HV not connected)
Slot 17: 1304013781 (HV connected)
Slot 18: 1304013782 (HV connected)
Slot 19: 1304013783 (HV connected)