RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show submodule 11082014-1 - Archived data from Thu, 16. August 2018 12:30:14 CEST


This is all the information about the submodule 11082014-1. If it is wrong, edit the data.

Submodule specification:  
Serial: 11082014-1
Position: none
   
Location: Bochum
Notes: #4
2- x4y2 position deleted (double)


Version history

Time Author Change comment
06. Dec 2018 17:35:41 CET cschnier swap location 2 times to set all crystal positions right
06. Dec 2018 17:35:32 CET cschnier swap location 2 times to set all crystal positions right
14. Sep 2018 14:53:11 CEST tobias Deleted old production number and position.
16. Aug 2018 12:30:14 CEST tobias Set location to Bochum.
09. Jul 2018 10:55:27 CEST cschnier 2- x4y2 position deleted (double)
09. Jul 2018 10:17:48 CEST cschnier since 12.10.17 @ Bonn for tests -> back @ Bochum 04.07.18
06. Apr 2018 14:06:05 CEST cschnier 06.04.18 swaped unit UA0946
15. Nov 2017 09:55:43 CET cschnier since 12.10.17 @ Bonn for tests
12. Oct 2017 16:57:26 CEST cschnier
07. Jun 2017 12:12:26 CEST cschnier