RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show submodule 12032014-02 - Archived data from Tue, 06. November 2018 09:22:58 CET


This is all the information about the submodule 12032014-02. If it is wrong, edit the data.

Submodule specification:  
Serial: 12032014-02
Position: 4-X3Y3
   
Location: Bonn
Notes: #54 final


Version history

Time Author Change comment
23. May 2023 15:43:39 CEST cschnier Sensor #906 on position EBB is not working
25. Nov 2022 09:36:18 CET cschnier 24.11.2022 moved to FZJ
06. Dec 2018 17:37:07 CET cschnier swap location 2 times to set all crystal positions right
06. Dec 2018 17:36:57 CET cschnier swap location 2 times to set all crystal positions right
06. Nov 2018 09:22:58 CET cschnier 16.10.18
08. Oct 2018 14:42:07 CEST fgrimm